FROM IFC.TO A CONSTRUCTION-READY
ARCHITECTURAL MODEL.

Bloom Living — Phase 3 Granada 1. Architectural BIM development from document comparison to full modeling, blockwork shop drawings and quantity extraction.

PROJECT
Bloom Living · Granada 1
MY ROLE
BIM Architect
DISCIPLINE
Architecture
PROJECT CONTEXT
Residential · Construction BIM
Bloom Living aerial view View detail

INTRODUCTION

My scope was hands-on architectural BIM production: understand the changes, rebuild the architecture correctly, turn it into construction information, and extract measurable quantities from the model.

01 / BLOOM LIVING

Context

Bloom Living — Phase 3 Granada 1 is a residential development made up of multi-storey apartment buildings arranged around landscaped streets and community spaces. My role was BIM Architect, focused on the architectural construction model and its downstream outputs.

IFC vs IFT sheets reviewed
320+ vs 320+
Modeled building area
200,000+ m²
Architectural BIM model
From Scratch
Shop drawings and quantities
Blockwork + QTO

02 / BLOOM LIVING

My contribution

I handled the architectural BIM work as a connected production sequence.

01 · IFC vs IFT comparison

Compared 320+ IFC sheets against 320+ IFT / tender sheets across the project disciplines to identify changes and gaps before production.

02 · Architectural modeling from scratch

Developed the architectural Revit model from the ground up, covering more than 200,000 m² of non-repeated building area.

03 · Blockwork shop drawings

Used the developed model as the source for construction-ready blockwork documentation.

04 · Blockwork quantities

Extracted model-based blockwork quantities by wall type, thickness and material specification.

05 · Plaster quantities

Produced plaster quantity outputs from the architectural model to support measurement and cost-control activities.

06 · Model-to-data workflow

Turned one BIM model into shop drawings and measurable quantities — not just a 3D representation.

03 / BLOOM LIVING

Process

The work moved from document validation into full model authoring, then from the model into construction documentation and quantities.

  1. Compare IFC vs IFT

    Review 320+ IFC sheets against 320+ IFT / tender sheets and identify design changes before production.

  2. Build the architecture

    Create the architectural model from scratch across more than 200,000 m² of non-repeated building area.

  3. Develop blockwork

    Model wall systems with the correct types, thicknesses and construction logic.

  4. Extract shop drawings

    Use the model as the source for blockwork shop-drawing views and construction documentation.

  5. Extract quantities

    Generate blockwork and plaster quantities directly from the BIM model.

04 / BLOOM LIVING

IFC vs IFT comparison

The comparison stage was the first quality filter. I reviewed 320+ IFC sheets against 320+ IFT / tender sheets before modeling, so the architectural changes were understood and reflected in the construction model from the start.

320+ IFC sheets

Reviewed the issued construction information used as the basis for production.

320+ IFT / tender sheets

Reviewed the tender package as the comparison baseline.

Change tracking

Captured revisions in doors, roofs, stairs and general architectural scope before modeling.

Comparison package

Organized the identified differences into a working comparison package for production reference.

05 / BLOOM LIVING

Architectural modeling

I rebuilt the architectural BIM model from scratch and used it as the single source for drawings and quantities across more than 200,000 m² of non-repeated building area.

Bloom Living architectural modeling view 1 View detail
ARCHITECTURAL MODELING / OVERALL MODEL VIEW
Bloom Living architectural modeling view 2 View detail
ARCHITECTURAL MODELING / SECOND OVERALL VIEW

06 / BLOOM LIVING

Blockwork shop drawings

The architectural model was developed to support construction documentation. Blockwork shop drawings were extracted from the BIM model so the documentation remained connected to the actual modeled wall systems.

07 / BLOOM LIVING

Quantities

The architectural model was used to extract blockwork and plaster quantities directly from the BIM data. The quantity workflow was organized by wall type, thickness and material specification to support measurement and cost-control activities.

Bloom blockwork quantity sheet View detail
BLOCKWORK QUANTITIES / MODEL-BASED ARCHITECTURAL OUTPUT

08 / BLOOM LIVING

Output

The project produced a clear chain of architectural BIM outputs.

01

IFC vs IFT comparison package

Documented the changes that had to be reflected in the construction model before production.

02

Architectural BIM model

Complete architectural model developed from scratch across more than 200,000 m² of non-repeated building area.

03

Blockwork shop drawings

Construction-focused blockwork documentation extracted directly from the BIM model.

04

Blockwork + plaster quantities

Model-based quantity outputs supporting measurement and cost-control workflows.

09 / BLOOM LIVING

Result

The work turned a large IFC-to-IFT comparison into a construction-ready architectural BIM model, then converted that model into blockwork shop drawings and model-based quantity outputs across more than 200,000 m² of building area.

Changes understood early

The 320+ vs 320+ review reduced the risk of modeling outdated tender information.

One model, multiple outputs

The architectural model supported shop drawings and quantity take-off within one connected workflow.

Construction-focused BIM

Blockwork was developed with the wall types and information needed for downstream construction use.

Data beyond geometry

The model supported blockwork and plaster measurement in addition to 3D architectural production.

THINK.
SOLVE.
PRESENT.