EPICO 3 — Biologicals & Biosimilar Manufacturing Facility. Architectural and interior BIM production for construction shop drawings, combined with multidisciplinary coordination and clash detection in Navisworks.

EPICO 3 project render
PROJECT
EPICO 3
MY ROLE
BIM Architect + BIM Coordinator
LOCATION
10th of Ramadan City · Egypt
PROJECT CONTEXT
Pharmaceutical Manufacturing Facility
EPICO 3 project render View detail

INTRODUCTION

My work on EPICO 3 combined production and coordination. I developed architectural and interior BIM information for construction shop drawings, then used Navisworks to review the multidisciplinary model and identify clashes before issue.

PROJECT TEAM / KYDEC × Rowad Modern Engineering

01 / EPICO 3

Context

EPICO 3 is a pharmaceutical manufacturing facility in 10th of Ramadan City. The BIM work covered several building and interior packages, including blockwork, floor finishes, wall finishes and wet-area detailing, with coordination across the architectural and multidisciplinary model environment.

Shop drawing modeling
Blockwork
Interior modeling scope
Ceilings
Floor + wall + wet areas
ID Finishes
Coordination + clash detection
Navisworks

02 / EPICO 3

My contribution

My role connected detailed BIM production with coordination.

01 · Blockwork modeling

Developed the architectural blockwork model to support construction shop drawings, including wall types, openings and fire-rated conditions.

02 · Ceiling modeling

Worked on reflected ceiling BIM development as part of the interior construction package.

03 · ID finishes modeling

Modeled and documented floor finishes, wall finishes and wet-area interior details.

04 · Shop-drawing production

Converted BIM development into construction-ready plans, finish drawings and wet-area details.

05 · Coordination

Reviewed the multidisciplinary model and supported design coordination between architectural and service systems.

06 · Clash detection

Used Navisworks to run and review clash detection, identify conflicts and support issue resolution before drawing issue.

03 / EPICO 3

Process

The workflow moved from discipline modeling into detailed shop-drawing production, then into multidisciplinary coordination and clash review.

  1. Develop the model

    Build blockwork, ceiling and interior finish information at construction level.

  2. Prepare shop drawings

    Extract detailed plans and interior documentation from the BIM model.

  3. Federate for coordination

    Review architectural information alongside other disciplines in Navisworks.

  4. Run clash detection

    Identify coordination conflicts and feed the results back into the production workflow.

04 / EPICO 3

Modeling

The model had to support both architecture and specialist interior information. I worked on blockwork, ceiling layouts and interior finishes so the BIM model could act as the source for the construction documentation package.

EPICO BIM model View detail
EPICO 3 / BIM MODEL VIEW

05 / EPICO 3

Shop drawings

The project required several drawing types to be developed from the BIM workflow. The samples below show the construction-level documentation produced across architecture and interior design.

EPICO blockwork shop drawing View detail
BLOCKWORK SHOP DRAWING / B02 WAREHOUSE
EPICO floor finish drawing View detail
FLOOR FINISH SHOP DRAWING / B01 ADMINISTRATION
EPICO wall finish drawing View detail
WALL FINISH SHOP DRAWING / B04 UTILITY
EPICO wet area drawing View detail
WET AREA / CERAMIC TILING DETAILS

06 / EPICO 3

Coordination

I supported the coordination process using Navisworks, reviewing the architectural and interior BIM scope against the other project disciplines. Clash detection was used to identify conflicts early and reduce the risk of issuing shop drawings with unresolved spatial coordination issues.

07 / EPICO 3

Output

The project produced a broad construction-documentation package supported by BIM coordination.

Blockwork shop drawings

Architectural blockwork plans with wall types, fire ratings, openings and room-based coordination information.

Ceiling BIM modeling

Interior ceiling modeling supporting coordinated construction documentation.

Floor and wall finishes

Detailed finish drawings for administration and utility building packages.

Wet-area details

Room plans and elevations for ceramic tiling and interior wet-area construction.

Navisworks coordination

Multidisciplinary review and clash detection supporting drawing quality before issue.

08 / EPICO 3

Result

EPICO 3 combined detailed shop-drawing production with live BIM coordination. The architectural and ID models were developed as construction information, then reviewed in Navisworks so blockwork, finishes, ceilings and wet-area details could be issued with stronger multidisciplinary coordination.

Construction-ready BIM

The model was developed beyond geometry to support detailed shop drawings.

Architecture + ID integration

Blockwork, finishes, ceilings and wet-area packages were developed within one BIM workflow.

Clash-driven review

Navisworks coordination helped catch spatial conflicts before drawing issue.

Production and coordination experience

The project strengthened both my BIM Architect and BIM Coordinator capabilities.

THINK.