THE SYSTEMBEHIND THE MODEL.
Al Firas BIM Delivery Ecosystem. From validating incoming information to coordinating the system that turns models into deliverables.
AL FIRAS GENERAL CONTRACTING / BIM MANAGER
MY OVERALL
INTEGRATION WORK.
I connect the requirements, people and information that keep BIM delivery moving—from the first model to the decisions made on site.
Align the delivery
Illustrative management workflow
BIM management
Together with the BIM Leader, I contribute to the BEP, strategies, workflows and standards that align the team with Aldar’s EIR.
Al Firas BIM Team Annual Report, p. 23
AL FIRAS / BIM TEAM OUTPUTS
Delivery, at a glance.
Annual report snapshot · across projectsShop drawing sheets
Annual report, p. 18
RFIs
Annual report, p. 22
Dashboards
Annual report, p. 30
Reported team outputs across projects. These figures represent the team’s work and are not live project totals.
01 / AL FIRAS
Context
The BIM team’s annual report brings together work across Yas Riva, Bloom, Special Tasks and SHA, with additional technical presentation and construction sequencing activity.
02 / AL FIRAS
The challenge
Construction BIM connects many kinds of work: incoming IFC reviews, modeling, coordination, drawings, quantities, communication and reporting. Those activities need a common structure across disciplines.
03 / AL FIRAS
My role
The report identifies Ahmed Attia as BIM Manager. My role sits within a team structure that includes a BIM Leader, coordinators and discipline engineers.
04 / AL FIRAS
My contribution
The report attributes development and maintenance of the BEP, BIM strategies, workflows and standards jointly to the BIM Leader and BIM Manager. I present that as a shared management contribution.
05 / AL FIRAS
Process
The team compares information, develops models, coordinates disciplines, records issues, produces shop drawings and makes progress visible through dashboards and presentations.
06 / AL FIRAS
BIM / technical strategy
Aldar’s EIR provides the requirements against which management documentation is developed. Federation, clash detection, data management and model validation form part of the framework.
07 / AL FIRAS
Coordination
Model findings flow into coordination discussions, RFIs and technical letters. Daily contact between the BIM team, site and consultant supports review and response.
08 / AL FIRAS
Output
The report records 1,092 shop drawing sheets, 153 RFIs and 10 dashboards across the team’s work. These are report snapshots of team outputs, not individual achievements or live indicators.
09 / AL FIRAS
Result
The report shows a construction-stage BIM function spanning production, coordination and management. It provides evidence of delivered work without independently establishing project-wide savings.
10 / TOOLS & FRAMEWORKS
11 / SOURCE NOTES
Evidence & attribution
- Al Firas BIM Team Annual Report: organization p. 7; workflow p. 8; drawings p. 18; coordination p. 20; RFIs p. 22; management p. 23; dashboards p. 30.
- 4D construction sequencing is attributed to Laguna on p. 34, not to Yas Riva.